Case History

LAMBERTI Spa

Basic and detailed engineering for new plant reactor ETO

Mechanical and piping engineering
Hours of work: 2500

Several activities managed by multiannual framework contract

Mechanical and piping engineering
Overall commitment: about 4000 hours/year

CHEMTEX ITALIA Srl
Gruppo Mossi Ghisolfi

Ethanol dehydration unit Almagest AG - Bulgaria Detailed engineering

Mechanical and piping engineering, electrical and instrumental engineering
Hours of work: 1500

Basic engineering for Ethanol plant

Mechanical and piping engineering
Hours of work: 2500

Basic engineering for Bioethanol 2nd generation plant

Mechanical and piping engineering
Hours of work: 2500

Basic and detailed engineering for Ethanol Distillation plant

Mechanical and piping engineering
Hours of work: 1000

Layout study for third generation bioethanol plant

Mechanical and piping engineering
Hours of work: 1000

Structure engineering for pretreatment bioethanol plant

Mechanical and piping engineering
Hours of work: 600

CONQORD OIL Srl

Basic and detailed engineering for reactors group "Stoccaggio Emulsionabili"

Mechanical and piping engineering, electrical and instrumental engineering
Hours of work: 800

MINO Spa

Pneumatic and hydraulic piping
Interconnecting piping for high and low oil-pressure system

Interconnecting electrical system and sensors, cable system design and sensors positioning
Interconnecting piping for cooling system
Interconnecting piping for pneumatic system
Interconnecting piping for air oil lubrication system

Mechanical and piping engineering, electrical and instrumental engineering

Overall commitment: about 10000 hours/year

SIMIC Spa

Development of piping sketches and MTO

Mechanical and piping engineering
Hours of work: 2000

COFELY Spa

Detailed engineering and field measurement in their plant in Spinetta Marengo (AL)

Mechanical and piping engineering
Hours of work: 300

Feasibility study for new boiler installation

Mechanical and piping engineering
Hours of work: 300

SOGIN Spa / RES NOVA Spa

Basic and detailed engineering for electrical panels revamping, in Saluggia plant (VC)

Electrical and instrumental engineering
Hours of work: 2500

SOLVAY SPECIALTY POLYMERS
Gruppo SOLVAY

MAIN WORKS CARRIED OUT
Basic and detailed engineering for "Idrogenazione Catalitica"

Electrical and instrumental engineering, mechanical and piping engineering
Hours of work: 4800

Basic and detailed engineering for revamping "Autoclave di Polimerizzazione R400"

Electrical and instrumental engineering, mechanical and piping engineering
Hours of work: 3600

Basic and detailed engineering for "Telomeri iodurati"

Electrical and instrumental engineering
Hours of work: 2000

Basic and detailed engineering for "Rampa di carico Azeotropo"

Electrical and instrumental engineering, mechanical and piping engineering
Hours of work: 1900

Basic and detailed engineering for water treatment plant

Electrical and instrumental engineering, mechanical and piping engineering
Hours of work: 4200

Basic and detailed engineering for "Tecnoflon"

Electrical and instrumental engineering, mechanical and piping engineering
Hours of work: 3500

Basic and detailed engineering for the increase of "Telomeri iodurati"

Electrical and instrumental engineering
Hours of work: 2300

Basic and detailed engineering for "Tecnoflon nuovo Reattore R2101D"

Electrical and instrumental engineering
Hours of work: 3500

Basic and detailed engineering for "Photosynthesis Y"

Electrical and instrumental engineering
Hours of work: 4000

Detailed engineering for MV/LV Power Station C15

Electrical and instrumental engineering
Hours of work: 600

Basic and detailed engineering for "Sintesi Tensioattivi"

Electrical and instrumental engineering, mechanical and piping engineering
Hours of work: 6000

Basic and detailed engineering for "IV Linea di Fluorurazione"

Electrical and instrumental engineering
Hours of work: 3000

Basic and detailed engineering for "Recupero solventi R12"

Electrical and instrumental engineering
Hours of work: 2100

DEMONT Srl

Detailed engineering for SA1N/1 boiler revamping by ERG POWER PLANT in Priolo Gargallo (SR)

Electrical and instrumental engineering, mechanical and piping engineering
Hours of work: 1800

Detailed engineering for A100 WATER SUPPLY WELLES FLOWLINES & MAIL HEADER REPLECEMENT PROJECT, for MELLITAH OIL&GAS, Libya

Electrical and instrumental engineering
Hours of work: 800

Detailed engineering for ENI POWER PLANT in Bolgiano (MI) for design and updating of the cogeneration central.

Electrical and instrumental engineering
Hours of work: 2000

EDISON Spa

Qualified supplier since January 2013

Electrical and instrumental engineering